Drill Data Highlights - Tempest

 

Drill Hole From (m) To (m) Interval (m) Ag (g/t) Zn (%)
11TP-01 447 448.14 1.14 23.9 3.1
and 474.77 491.51 16.74 29.6 -
including 474.77 480.5 5.73 67.5 -
including 474.77 476.77 2 157.5 -
           
Drill Hole From (m) To (m) Interval (m) Ag (g/t)  
11TP-02 59 163.2 104.2 19.3  
including 142 162.1 19.8 51.1  
including 143 144 1 195  
           
Drill Hole From (m) To (m) Interval (m) Ag (g/t)  
11TP-03 33.6 55.05 21.45 9.32  
           
Drill Hole From (m) To (m) Interval (m) Ag (g/t)  
11TP-08 143 147.5 4.5 50.6  
including 145 146 1 45.5  
including 146 146.7 0.7 161  
including 146.7 147.5 0.8 43.1  

 

Drill Hole From (m) To (m) Interval (m) Au (g/t) Ag (g/t)
12TP-12 65.45 65.78 0.33 134.5 -
12TP-12 65.78 65.93 0.15 58 -
12TP-12 231.85 282.28 50.43 - 32.6*
and 294.05 301.25 7.2 - 29.7*
including 267.81 268.91 1.1 0.82 537

 

*All intervals composed of multiple samples are weighted averages. Intervals given are the length of core intersection and may not represent true widths.

For more detailed drill data, click here.